Not legal advice. No template is compliant out of the box. A SWMS has to be made site-specific with the workers doing the job before work starts. SWMS Kit is not a regulator.

Guides

The same pages that have been on swmskit.com, plus a glossary. Current at 2 November 2026. Not legal advice.

Electrician working among cables in a roof cavity
The guides sit next to the work: ceiling spaces, heights, boards, trenches.
  • What is a SWMS?

    The 18 model-law categories, what a SWMS is for, and what regulators say to leave out.

  • SWMS in NSW

    WHS Regulation 2025, SafeWork NSW Form 05, and the $250,000 principal contractor threshold.

  • SWMS in Queensland

    Sections 299–303. The WHS penalty unit is $100, so 60 penalty units is $6,000.

  • SWMS in Victoria

    19 high risk construction work categories and why a model-law file is not enough.

  • SWMS in South Australia

    The 2 metre fall threshold from 1 July 2026, and a $450,000 construction project.

  • SWMS vs JSA

    What is legally required for high risk construction work, and what is not.

  • Who signs a SWMS?

    Who prepares it, worker sign-off, and why a daily re-sign is not the rule.

  • Glossary

    PCBU, HSR, HRCW, LOTO and the other words that show up on a SWMS.

  • Free pre-start checklist

    Three parts, printable, no email.

Pages from the kit

First page of SWMS 01 Energised Electrical Work showing the header block and site-specific checklist
SWMS 01 — header block and the make-it-site-specific checklist.
Task table page of the Solar PV SWMS showing the five-column hazard-to-control layout
Solar PV SWMS — task, hazards, controls, how implemented, who’s responsible.
Toolbox talk page from the kit — electrical safety and lock-out/tag-out
One toolbox talk: electrical safety and lock-out/tag-out.